Feasibility study and Basic Engineering Design for increase the capacity of the HDPE plant International Two-stage tender with qualitative evaluation of contractors for Feasibility study and Basic Engineering Design for increase the capacity of the HDPE plant |
00-09 |
Sep 28, 2021 |
Tender |
View detail |
tender with qualitative evaluation of contractors International Two-stage tender with qualitative evaluation of contractors for Feasibility study and Basic Engineering Design for increase the capacity of the HDPE plant |
00-09 |
Jul 15, 2021 |
Tender |
View detail |
International Two-stage tender with qualitative evaluation International Two-stage tender with qualitative evaluation of contractors for debottlenecking study and increase the capacity of the Olefin plant |
00-01 |
00-01 |
Tender |
View detail |
International General Tender International General Tender for Ethylene Cracking Plant and red oil removal and Spent Caustic Treatment Jam Petrochemical Company |
99-26 |
- |
Tender |
View detail |
International Invitation to qualitative evaluation Process Safety Management (PSM) System (According to OSHA 29 CFR 1910.119) |
96-11 |
- |
Tender |
View detail |
International General Tender One-stage with qualitative evaluation consultants Process Safety Management (PSM) System (According to OSHA 29 CFR 1910.119) |
95-04 |
Dec 23, 2016 |
Tender |
View detail |
International General Tender International General Tender for Containerized Carriage |
94-23 |
Dec 24, 2015 |
Tender |
View detail |